Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the dipi-divi-pixel domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/climakomfort/climakomfortpl/public_html/wp-includes/functions.php on line 6121
Regional Hospital Building - CLIMA KOMFORT

    Outpatient and bed building

    Regional Hospital

    Regional Specialised Hospital in Grudziadz
    investor

    Clima Komfort
    contractor

    Grudziądz
    location

    hospital
    building type

    • 144.000 m3/h
      air
    • 29
      air handling units
    • ice water

     

    • 13.000 m2
      area
    • 1.200 kW
      cooling power
    • 63.000 m3
      volume
    The building has a volume of approximately 63,000 m3 and 13,000 m2 of built-up area, as well as a connector between Building A and Building B.

    SCOPE OF WORK PERFORMED

    Comprehensive execution of the installation of mechanical ventilation for domestic use, ventilation for the Clean Room, chilled water-based air conditioning and automation systems including the BMS.